Nazareth, Beer Sheva & Haifa Courthouses

  • Location:
    Nazareth, Beer Sheva and Haifa
  • Project Description:

    Design and installation of a complete building control system based on Johnson Controls, including the supply of controllers, software, and HMI. Supply and operation of 6 work stations in the various control rooms. Operating and monitoring the operation of approx. 20,000 control points, 600 air handling units, and 4,000 lighting points, integrated via the Instabus system. Integration with generators, chillers, multimeters, and fire detection hubs.