Yedioth Ahronoth

  • Location:
    Rishon LeTzion
  • Period:
    From 2015
  • Budget:
    NIS 1,200,000
  • Project Description:

    Installation of a control center including CCTV, access control, and intrusion detection, 80 internal and external IP cameras; NVR recording and data storage system; 90 controlled doors; speed gates at the building entrance, including a connection to the access control system.